Sunset SUP

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

About the Shared Use Path (SUP)

COS_ST&PS_Primary

The pathway runs along Sunset Drive on the east side, through Sunset Park and to Shelby Drive on the west side.

End Points 

The pathway ends at Sunset Park on the south end. At the northeast end, the pathway ends at Monte Verde Road. The northwest end of the pathway ends at Shelby Drive. 

Length

0.375 Miles

Surface

Concrete (0.25 Miles)

Stabilized Decomposed Granite (0.125 Miles)

Grades

Maximum Grade 5%

Photos

Sunset1

Sunset2